Generator Installations

Gensure's core business is the installation of standby generation sets and all associated equipment

Key Benefits


A vast resource of skilled tradesmen, which means reduced downtime during holiday and sickness periods
A large supplier base, which means materials are always in stock.
Our vast experience in this industry means we can offer turnkey installation packages

 

New Citygroup building, Canary Wharf, London

This installation consisted of two 1.5mW diesel generators. These were delivered in kit form - radiator, engine and alternator along with inlet and outlet attenuation and an acoustic wall - and all were assembled on site. The very nature of this site demanded an extremely high level of Health and Safety awareness, which was closely monitored by Canary Wharf Management.

 

 

 

 

Southern Water, WTW. Sandown, Isle of Wight.

At the time of construction, this was the largest project on the Isle of Wight for many years. The view here is of the Secondary exhaust silencers and outlet attenuation.

The view below is just one of the three generators installed at this site. The primary exhaust silencers were thermally insulated and clad with stainless                                                                     steel.

 

The fuel transfer system consisted of two external bulk storage tanks, one dump tank, three internal day running tanks and seven pumps (rated at IP65). The internal day tanks were fitted to a high- rise stileage approx. 5mtrs high.

 


 

 

 

Other Projects Completed

HOSPITALS

Including one on the Falkland Islands

TELEVISION STATIONS

Playboy TV

VARIOUS H.M. PRISONS

VARIOUS SHOPPING MALLS

R.A.F. STATIONS

ARMY BARRACKS

WESTMINSTER CITY HALL

VARIOUS CABLE AND WIRELESS

LEISURE COMPLEX

FOOD AND DRINK PROCESSING PLANTS

 

 

Gensure, Woodlands, 90 London Road, Wickford, Essex, SS12 0AR
Tel: 0845 500 4410 Fax: 01268 454 482

Design and Hosting By Blue Chilli Limited